Sherman III DV Hull, M3 bogies style 1942
Sherman III early DV Hull 1942, M3 bogies style
Sherman III early DV hull, extremely detailed model with great historical accuracy.
You can mount with this pack at least 3 different versions of Sherman III early DV hull.
DESCRIPTION Sherman III early DV Hull, M3 bogies style
The shortage of the excellent Continental aircraft engine, used on the M4 and M4A1 Shermans, forced the Americans to install other engines in the Sherman hulls. The M4A2 version (the English Sherman III) received a GM diesel engine.
The M4A2 version of the Sherman used a welded hull almost identical to the M4A1, but with a pair of ventilated armored grilles on the rear hull deck. The M4A2 tanks used the GM 6046 twin diesel engine. This was the preferred version for Soviet Lend-Lease deliveries since the USSR only used diesel engines. The M4A2 was produced in six factories with 10,968 units of all types produced between April 42 and July 45.
Early M4A1s also had the M3 pattern bogies.
Armament early prod:
The models :
File contents:
28 unsupported stl files, 28 supported stl files, some visuals, a "redme before print" pdf file.
The 28 stl files contain:
Counlane models.
Sherman III early DV hull, extremely detailed model with great historical accuracy.
You can mount with this pack at least 3 different versions of Sherman III early DV hull.
DESCRIPTION Sherman III early DV Hull, M3 bogies style
The shortage of the excellent Continental aircraft engine, used on the M4 and M4A1 Shermans, forced the Americans to install other engines in the Sherman hulls. The M4A2 version (the English Sherman III) received a GM diesel engine.
The M4A2 version of the Sherman used a welded hull almost identical to the M4A1, but with a pair of ventilated armored grilles on the rear hull deck. The M4A2 tanks used the GM 6046 twin diesel engine. This was the preferred version for Soviet Lend-Lease deliveries since the USSR only used diesel engines. The M4A2 was produced in six factories with 10,968 units of all types produced between April 42 and July 45.
Early M4A1s also had the M3 pattern bogies.
Armament early prod:
- M3 75 mm gun
- 1 Browning Machine Gun 7.62mm in turret
- 1 Front Browning Machine Gun 7.62mm
- 1 Browning M2 12.7 mm turret-mounted machine gun (optional)
The models :
- Model only tested and intended for resin printing at 1/56 scale.
- The models are hollowed out to save resin.
- Total weight of the most complete model (with crew members): 77g
File contents:
28 unsupported stl files, 28 supported stl files, some visuals, a "redme before print" pdf file.
The 28 stl files contain:
- 1 dv hull
- 1 turret early prod
- 1 M3 75mm barrel
- 2 cupola : one closed, one open
- 2 hatches left and right for open cupola
- 2 hull hatches open and close,( mirror it for other side)
- 2 antenna
- 2 turret browning
- 1 turret mount for browning
- 5 optional front stowages
- 1 early tracks type T41, you need mirror it for the second.
Counlane models.
Filename | Size | Last updated |
---|---|---|
sherman Mk.III DV early.zip | 188.2 MiB | 2025-02-01 |
redame before print.pdf | 71.3 KiB | 2025-02-01 |